Jan 1, 2024
Manifold Fabrication for Talisman Sinopec Energy UK
Manifold Fabrication for Talisman Sinopec Energy UK
Global Energy Group completed the Fabrication, NDT, Coating, Assembly and Systems Integration Testing of a 260tn three Slot Production Manifold, including Cassette, Protection Structure and Roof Panel.
In addition, the GEG scope included the following associated structures:
- 1 x Gas Export SSIV Tie-In Structure (62tn)
- 6 x Spool Pipe Supports for Cayley ‘Trees’
- 1 x Umbilical Pull-In Winch Skid Base
Once complete, the subsea equipment was moved to the adjacent Clipper Quay at the Port of Aberdeen, for direct loadout onto the company vessel.