Aberdeen Nord Centre

Facility Overview
Global Energy Group's Aberdeen facility is located in the Nord Centre, a secure industrial complex located adjacent the Port of Aberdeen. Boasting 3,000m2 of covered fabrication, our facility at the Nord Centre benefits from direct quayside access for loadout operations to the North Sea.Global Energy Group occupies four of the industrial units at the Nord Centre, which are primarily used for carrying out covered fabrication of bespoke subsea equipment and topside packages for oil and gas projects. The facility also benefits from additional warehousing and storage directly on Port of Aberdeen’s 175m Clipper Quay, featuring 9m water depth LAT.

Fabrication Facilities
Global Energy Group has grown to become a leading fabricator within the energy industry, occupies four of the industrial units at the Nord Centre. Units E, F, K, and L are primarily used for carrying out covered fabrication of bespoke subsea equipment and topside packages for oil and gas projects.
With direct access to the North Sea, Global Energy Group is well positioned to meet the demands of Scotland’s growing energy sector.

Key Information
Unit E — Covered Fabrication: 588m2, Crane Capacity: 1x10T, Hook Height: 6.5m
Unit F — Covered Fabrication: 588m2, Crane Capacity: 1x20T & 1x10T, Hook Height: 6.5m
Unit K — Covered Fabrication: 901m2, Crane Capacity: 1 x 20T & 1 x 5T, Hook Height: 7.5m
Unit L — Covered Fabrication: 901m2, Crane Capacity: 1 x 20T & 1 x 5T, Hook Height: 7.5m
Clipper Quay Warehousing Unit — Length: 45m, Width: 37m